In the construction of the stadium or other engineering construction, there is a quality standard inspection to verify whether the project meets the standard quality and meets the specifications. The following small series simply lists the silicon PU basketball court.
First, the course marking requirements are clear and non-reflective, straight and smooth without a virtual side.
Second, the surface layer can form a hard layer with a certain thickness, wear and scratch resistance. Scratch the surface with a non-sharp hard object, and the qualified product should not be damaged.
Third, the feeling of the foot: no sticky feet, no obvious feeling of trapped feet, non-slip without sanding.
Fourth, please try to smell the truth, the real silicon PU surface layer is a water-based material, there should be no obvious odor.
5. The color of the silicone PU basketball court is even.
Sixth, the surface roughness is moderate.
Seven, no delamination and bubble phenomenon. The thickness of the plastic surface layer should meet the requirements of the design and related specifications.
Eight, the surface is flat, and there is no large area of water after the rain.