东莞龙翔体育设施有限公司官网欢迎您的到来!

Online message About us Sitemap 中文 / English

National professional sports field material supplierPlastic track materialSilicon PU course materialAcrylic stadium material

National service hotline

0769-88031856

400-811-0201

product category

contact us

National service hotline:076988031856&
E-mail:2431773475@qq.com
Chinese website:www.longxiangtiyu.com
company address:16th Floor, Changping Chamber of Commerce Building, Changping Town, Dongguan, Guangdong, China    
Factory address:No.143, Zhuyuan Group, Xitian Village, Shiwan Town, Boluo County, Huizhou city, Guangdong Province。China

常见问题

Your current location: Home > Industry information > 常见问题 >

Description of maintenance and maintenance of permeable floor

发布日期:2019-09-29 点击:

The permeable floor is a waterproof, anti-corrosive, non-slip environmentally friendly material that not only absorbs the noise generated by the vehicle, but also absorbs a large amount of dust and reduces the pollution in the air.

东莞透水地坪厂家

Because there are many holes in the permeable floor, it is easy to drop water and dry, so maintenance is very important. Especially in early curing, it is necessary to pay attention to prevent a lot of evaporation of water in the floor. The permeable concrete demoulding is shorter than the plain concrete. If the side surface and the edge are exposed to the air, the plastic film or color strip cloth is used to cover the road surface and the side surface in real time to ensure the humidity and cement hydration.

The permeable floor should be sprinkled for maintenance one day after pouring. When pouring water, it is not advisable to use the pressure water column to directly rush the concrete surface. It may take some cement slurry to form some thin parts, but it can be directly from the normal state. Water down. The watering and maintenance of the permeable floor should be no less than 7 days.