About the maintenance and maintenance of epoxy floor
1. After the construction of the flat land is completed, it needs to be maintained for 7-10 days before it can be put into use. During the curing period, water or other solution should be avoided to infiltrate the surface. 2. Any employee who enters the workshop must be replaced with a rubber-soled shoe (no black-soled shoes that can be worn at the bottom of the foam) (so that the outside sand will be brought into the workshop and the ground will be scratched)
3. Any hardware: such as iron chairs, iron tables, iron shelves, etc., should be wrapped with soft plastic, rubber or paper pad to avoid scratching the ground during use.
4, the tractor needs to fully lift the board off the ground, please pay special attention to the corner of the board when cornering, do not scratch the ground
5. When cleaning the floor, please use soft mop or wet and dry vacuum cleaner, clean with water or detergent, but please pay attention to the ground slippery
6. If it is worn or scratched due to long use time, local repair can be carried out in a small area. If the area is large, it is recommended to re-roll once.
7. Before the equipment enters the factory, lay the bottom of the cardboard box on the floor to avoid scratching the ground during the transportation equipment.
8, carts, cart wheels, please use hard or elastic rubber wheel, and separate use inside and outside the plant
9, can be waxed according to the ground requirements (the effect can prevent ground scratches)