In spring and summer, there is plenty of rain. When the weather is hot, this time is a very strict test for qualified plastic track. The maintenance personnel of the runway must also maintain the plastic site to avoid damage to the plastic track. Xiaobian made several suggestions;
First, timely clean up the moisture left by the movement, it is forbidden to soak the plastic track in the accumulated water. Although some grounds use water-proof glue to separate the water source, long-term immersion will seriously affect the service life of the plastic track. In the cleaning process, the sewage is drained by a water absorbing machine in time, and a small amount of residual water on the rubber surface can be wiped off with a dry cloth after cleaning. Oil stains can be cleaned with 10% ammonia or detergent or detergent.
Second, avoid fireworks and isolate the heat source, avoid contact with organic solvents, chemicals, cigarette butts and other fires, pollutants, etc., and the bottom of the roots polluted and corroded by diesel oil is resolutely dug, filled with rubber.
3. After the athletes are active on the plastic track, sweat or beverages are spilled on the plastic track. Site maintenance personnel should promptly remove all kinds of dirt and water from the site.
Fourth, it should be noted that the summer weather is very hot and boring. It is necessary to avoid the plastic runway from catching fire. The plastic runway is suitable for all-weather use under certain drainage facilities. Eliminate flammable materials from entering the plastic track. Do not allow hard, rough cleaning tools to prevent sharp objects from hitting the plastic track.
5. For the local people with more people and more plastic plastic track wear, the protection period should be shortened. Pay attention to the margin and do not arbitrarily move. If the tooth damage or blistering appearance is found, the construction unit should be protected in time. Remember to prohibit The vehicle travels on the runway, stacking heavy objects and sharp objects.